
Search by job, company or skills
Organize, control & follow up execution of all maintenance activities in Respective sections i.e. Switchyard, Crusher and Mines area to ensure achievements of set target in terms of production rate, Quality, Energy consumption and Breakdowns at optimum and ensure high levels of environment and safety.
Key Responsibilities:
1. Assist the supervisor to organize the entire Preventive and corrective maintenance activities of the section.
2. Measurable actionsto be taken for reducing the Power cost.
3. Actions to be taken for providing the un-interrupted Power for smooth operation of the plant.
4. Actions to be taken for improve the Energy Monitoring system by which detailed analysis of the power can be done in smooth way.
5. Detailed analysis of breakdowns and implementation of corrective actions.
6. Manage and control section maintenance expendiature within agreed budgets.
7. Implementation of safety system and execution of work related to enhance safety at workplace and culture.
8. Implementation of System (ISO, OHSAS, SA 8000 etc.) and Aditya Birla Excellence Framework.
9. Monitor the reports on costs, performance, etc, as required.
10. Develop self and others knowledge in all relevant field.
Job Context: UltraTech Cement Limited has an annual capacity of 52 million tonnes. It manufactures and markets Ordinary Portland Cement Portland Blast Furnace Slag Cement and Portland Pozzalana Cement. It also manufactures ready mix concrete RMC. The company has 11 integrated plants one white cement plant one clinkerisation plant in UAE 15 grinding units 11 in India UltraTech Cement is the country largest exporter of cement clinker. The export markets span countries around the Indian Ocean Africa Europe and the Middle East.2 in UAE one in Bahrain and Bangladesh each and five terminals four in India and one in Sri Lanka. UltraTech Cement is the country largest exporter of cement clinker. The export markets span countries around the Indian Ocean Africa Europe and the Middle East. Sewagram Cement Works was commissioned in 2009. The plant has clinker capacity of 3.6 MTPA and cement capacity of 2.4 MTPA. The Unit has two captive power plants (CPP) CPP-I with 35 MV and CPP-II with 22.5 MV capacity. The Unit has mines with reserve of 246.45 MT, a captive jetty, a desalination plant that can filter around 20 lakh litres of water every day and a bag-making plant. The plant also has an environmental cell which monitors air and water quality, audits, and conducts marine ecological studies and environmental studies of mines and nearby villages.
Job Challenges:Reduction in overall cost of cement production.
Reduce the Power cost by optimizing the power sources.
Skill level of contractor manpower.
Reduce the breakdown and implementation of corrective actions.
| KRA (Accountabilities) (Max 1325 Characters) | Supporting Actions (Max 1325 Characters) | |
|---|---|---|
| KRA1 | Accountability- Operation & Maintenance Jobs- Assist superior in all operation maintenance activities to maximize the plant availability to achieve production as per targets. | By Assisting Superior in- -Studying stoppage report -Studying checklist -Supervising maintenance jobs -Coordination for conditional monitoring. -Developing SAP data. -Organizing material / manpower required. |
| KRA2 | Cost Optimisation- Assist superior in Study and analyze and maintenance cost compared to budget norms and implement action plans to optimize consumption/ maintenance cost. | By Assisting Superior in- -Preparing budgets. -Monitoring actual cost with budget. -Taking corrective actions. -Monitoring inventory. -Identifying Kaizen/focused improvement area. -Studying abnormalities / deviations -Analysing problematic areas -Reviewing material requirement & inventory. -Controlling contractor cost. -Controlling over time. |
| KRA3 | Modification / Upgradation- Assist superior in Identifying and carryout proposals for modifications / up-gradations for improvement in plant working on continuous basis in the section | By Assisting Superior in- -Analyzing problems, breakdowns. -Identifying areas requiring improvement -Carry out why-why analysis. -Review drawings / specifications -Formulate proposal. -Implementation of approved proposals. -Reviewing Technical Cell suggestions and implementation |
| KRA4 | Safety & statutory compliance- Assist Superior in Carryout timely inspection of all jobs required as per statutory guidelines and ensure their timely compliance. | By Assisting Superior in- -Checking, testing as per guidelines. -Maintain statutory records of the observations. -Taking corrective measures for deviations. -Identifying & rectify unsafe points & unsafe practice in the area. -Training to staff / workmen on safety & treatment. |
| KRA5 | System Implementation- Assist superior in implementation of ISO, EMS, OHSAS, SA 8000 and WCM systems in his area of operation for the improvement of quality standards and productivity. | -By participating in all System implementation related activities and implement the systems as per the directions of superior. |
Diploma
Job ID: 145524693