Having experience and depth knowledge in -
Overall execution, resource planning, Material Requirement, client coordination, Daily supervision, quality checks, progress reporting for -
- Installation, testing & commissioning of 66kV /132kV/220kV Gas Insulated Substation (GIS) and Air Insulated Substation (AIS), Distribution substations(11kV/22kV/33kV) i.e., Auxiliary & Main Sub-station.
- Installation of all Electrical Heavy Equipments i.e., Transformers (Power & Distribution), HT Boards, CT, PT, CRP, SCADA (RTU), LT Panel, Bus duct, ACDB, DCDB, Battery Bank, Battery charger, Compact Sub-station, DG up to 1.5 MVA.
- EHV(66kV) & MV(11kV) cable laying, different type of jointing works (Straight through Joint, End Termination Joint at GIS/HT Board/Transformer Primary Side)
- LT Power & Control cable laying & Termination works
- Complete Illumination works from Building Indoor, Outdoor, Street light & High Mast , GI conduiting works in slab & wall, Wiring, Fixture & Socket installation
- Fire detection, Alarm and Gas flooding arrangement system with interfacing with third part system(SCADA)
- HVAC System with VRF/VRV for Large Scale Building
- Access control and PIDS System
- EOT crane installation works
- PHE works (Rainwater harvesting and Plumbing works)
- Cable Tray Installation with Support Angle and different type of bend for Cable Laying Works
- Complete Grid Earthing Works using Copper/MS Conductor using exothermic welding for different types of Cross-Joint, T-Joint, L-Joint, Tap-off for riser for Equipment earthing.
- Complete Building Lightning Protection Works with suitable spike arrangement/surge arrester.
- Overhead MV/LV cable laying works on viaduct in any Metro/Railway Project using Mechanized arrangement i.e Winch Machine