Qualification: BE Civil
Experience: 2 to 5 yrs
Salary: Rs 2.50 to 3.0 LPA
Work location: near Chandani chowk in Pune
Organization Structure: Jr. Engineer reports to QS Estimation Head.
Purpose:
- Responsible for providing BOQ of all Construction Activity to prepare initial Budget on given timeline.
- Responsible for providing BOQ of all Construction Activity to prepare Final Budget on given timeline.
- Responsible for accurate estimates and quantities of material to purchase Labour to billing.
- To support Site, ERP, Purchase, Contracts Billing Dept. in Providing BOQ on given timeline.
- To support Store Dept. in monthly Material Audit.
- To support Construction Management in Reconciliation.
- Responsible for all QS related activity.
1) Area calculation:
- Work out Slab Area to derive constant
- Work out Slab Area for billing purpose for activity RCC BBM Plaster work from Working RCC drawing
2) Quantity Survey
- Quantification of all Construction Activities to prepare initial Final Budget
- Quantification of Material Qty of all construction activity and provide to Site, Purchase, Contracts, Billing and ERP uploading
- Quantification of Labour Qty of all construction activity and provide to Site, Contracts, Billing and ERP uploading
3) Listing and updating
- Prepare Material Rate List and update it on time to time
- Prepare Labour Rate List and update it on time to time
- Derive and Maintain Qty constants, Material Constants of various construction activities
4) Budget formation:
- Rate Analysis of various work items wherever required
- Preparation of Activity Budget with help of Senior
- Prepare BOQ for initial Final Budget
- Preparation Drawing Assumption list used for Budgeting
- Incorporate changes in Budgets Drawings as per site checking
5) Verification Reconciliation
- Jointly checking quantities with Site Engineer with specifications of all items and obtaining approval of concerned authorities on it
- Prepare reconciliation of all major items (as decided by Management) on completion of every mile stone
- On site Area Verification
6) Support Coordination
Architect Dept:
- Workout Design wastage for tiles it helps to redesigning and value addition
- Suggestion to reduce wall thickness
- Follow up for latest Drawing revision and specification
Contracts Department:
- Provide Builtup Area calculation to finalize contract for RCC BBM Plaster Work
- Providing BOQ of all construction activities to finalize work contract
Support to Billing Department:
- Providing final quantities area for billing purpose
- Providing material reconciliation to debit/Rating contractor
Support to ERP Department:
- Providing BOQ in ERP format to upload in system
Support to Site:
- Providing BOQ of all construction activity
- Support to reconcile material
- Support to Quantity verification finalization
- Providing material Quantity for indenting
- Coordination with site engineer for all QS related activity
7) Supplementation:
- To change all budgets as per site
- To change all budgets as per revised Drawings
- To change all budgets as per revised Specification
- To change all budgets as per revised labor Material rates
- To change all budgets as per revised labor Material activities
8) Value engineering:
- To compare all budgets as per working methods
- To compare Rate analysis of same activities with different working material methods
- Workout Design wastage it helps to redesigning and value addition
- To check all drawings suggest alternate changes to reduce cost
9) Record Keeping Updating:
- Final area in soft copy
- Finalize quantities as per site in Soft hard copy
- Reconciliation of various work items
- Monthly material stock audit
- All revised Drawings Budgets
10) MIS:
- Maintain record keeping sheet
- Maintain Qty Status vs Site Status Sheet
- Maintain Drawing requirement and its revisions
- Maintain reconciliation status Sheet
- Maintain Daily Progress Report
11) Sign-offs:
- Taking signoff of site Engineer PM on final quantities
- Taking signoff of site Engineer, PM Estimation Head on Reconciliation sheet