Search by job, company or skills

T

Jr. Engineer Quantity Surveyor

2-5 Years
new job description bg glownew job description bg glownew job description bg svg
  • Posted a month ago
  • Be among the first 40 applicants
Early Applicant
Quick Apply

Job Description

Qualification: BE Civil

Experience: 2 to 5 yrs

Salary: Rs 2.50 to 3.0 LPA

Work location: near Chandani chowk in Pune

Organization Structure: Jr. Engineer reports to QS Estimation Head.

Purpose:

  • Responsible for providing BOQ of all Construction Activity to prepare initial Budget on given timeline.
  • Responsible for providing BOQ of all Construction Activity to prepare Final Budget on given timeline.
  • Responsible for accurate estimates and quantities of material to purchase Labour to billing.
  • To support Site, ERP, Purchase, Contracts Billing Dept. in Providing BOQ on given timeline.
  • To support Store Dept. in monthly Material Audit.
  • To support Construction Management in Reconciliation.
  • Responsible for all QS related activity.

1) Area calculation:

  • Work out Slab Area to derive constant
  • Work out Slab Area for billing purpose for activity RCC BBM Plaster work from Working RCC drawing

2) Quantity Survey

  • Quantification of all Construction Activities to prepare initial Final Budget
  • Quantification of Material Qty of all construction activity and provide to Site, Purchase, Contracts, Billing and ERP uploading
  • Quantification of Labour Qty of all construction activity and provide to Site, Contracts, Billing and ERP uploading

3) Listing and updating

  • Prepare Material Rate List and update it on time to time
  • Prepare Labour Rate List and update it on time to time
  • Derive and Maintain Qty constants, Material Constants of various construction activities

4) Budget formation:

  • Rate Analysis of various work items wherever required
  • Preparation of Activity Budget with help of Senior
  • Prepare BOQ for initial Final Budget
  • Preparation Drawing Assumption list used for Budgeting
  • Incorporate changes in Budgets Drawings as per site checking

5) Verification Reconciliation

  • Jointly checking quantities with Site Engineer with specifications of all items and obtaining approval of concerned authorities on it
  • Prepare reconciliation of all major items (as decided by Management) on completion of every mile stone
  • On site Area Verification

6) Support Coordination

Architect Dept:

  • Workout Design wastage for tiles it helps to redesigning and value addition
  • Suggestion to reduce wall thickness
  • Follow up for latest Drawing revision and specification

Contracts Department:

  • Provide Builtup Area calculation to finalize contract for RCC BBM Plaster Work
  • Providing BOQ of all construction activities to finalize work contract

Support to Billing Department:

  • Providing final quantities area for billing purpose
  • Providing material reconciliation to debit/Rating contractor

Support to ERP Department:

  • Providing BOQ in ERP format to upload in system

Support to Site:

  • Providing BOQ of all construction activity
  • Support to reconcile material
  • Support to Quantity verification finalization
  • Providing material Quantity for indenting
  • Coordination with site engineer for all QS related activity

7) Supplementation:

  • To change all budgets as per site
  • To change all budgets as per revised Drawings
  • To change all budgets as per revised Specification
  • To change all budgets as per revised labor Material rates
  • To change all budgets as per revised labor Material activities

8) Value engineering:

  • To compare all budgets as per working methods
  • To compare Rate analysis of same activities with different working material methods
  • Workout Design wastage it helps to redesigning and value addition
  • To check all drawings suggest alternate changes to reduce cost

9) Record Keeping Updating:

  • Final area in soft copy
  • Finalize quantities as per site in Soft hard copy
  • Reconciliation of various work items
  • Monthly material stock audit
  • All revised Drawings Budgets

10) MIS:

  • Maintain record keeping sheet
  • Maintain Qty Status vs Site Status Sheet
  • Maintain Drawing requirement and its revisions
  • Maintain reconciliation status Sheet
  • Maintain Daily Progress Report

11) Sign-offs:

  • Taking signoff of site Engineer PM on final quantities
  • Taking signoff of site Engineer, PM Estimation Head on Reconciliation sheet

More Info

Job Type:
Industry:
Function:
Employment Type:
Open to candidates from:
Indian

About Company

Turtlemint makes it easy to understand and buy insurance. Our intent is to “demystify” insurance by explaining the jargon in a simple way and providing smart tools to help a user make the right choice. From search to purchase, the entire process can be completed online in just a few clicks! We also have a team of friendly insurance advisors available on chat, phone and in-person to help users with purchase and claim services.

Job ID: 118081391