4) Key Result Areas/Accountabilities: |
Key Result Areas/Accountabilities | Supporting Actions |
MAINTENANCE, IMPROVEMENTS & RELIABILITY | - Do Regular/Routine rounds inside the Plant (Extrusion, Post-Extrusion, Die Shop and Die Service area, Powder Coating) to observe the equipment abnormalities like any signs of wear, damage, or malfunction and follow CLIT, self-maintenance activities, troubleshooting methods to reduce the abnormalities and reduction in Equipment Downtime
- Ensure 100% Equipment availability by Upkeeping, Maintaining, Coordinating and Monitoring all maintenance activities like Preventive, Shutdown, Corrective, etc in Extrusion, Post-Extrusion, Die Shop and Die Service area to
- To build a strong Maintenance Management System and utilize the same for measurement, monitoring and control of critical Maintenance Control and Result Indicators and to implement a system based on Reliability Centered Maintenance
- Analysing maintenance processes and identifying opportunities for improvement and reduce the unplanned Delays/downtime
- Discussion on chronic problems with your dept. team and & co-workers and eliminate it.
- Analysis of major / minor breakdowns and plan corrective actions accordingly.
|
SPARES MANAGEMENT | - Follow 7 Level Critical Spare criteria and Ensure 95% Critical spares availability and procure the required maintenance spares timely to avoid the breakdown delays.
- Overhauling of maintenance spares regularly and keep ready with spares
- Spare parts planning for major shutdown jobs as well as fulfilling day today basis requirements
- Planning and procurement of advanced good quality tools and tackles for fast execution of jobs
|
MANPOWER MANAGEMENT | - Providing training to other staff on proper equipment use and maintenance procedures.
- Collaborating with other departments, such as production or engineering, to coordinate maintenance activities and minimize disruptions
- Good Co-ordination with crew members to get the job done from them
|
COST CONTROL | - Identification of maintenance cost reduction parameters
- Minimise leakages and wastages
- Managing the maintenance including the cost of spare parts, equipment upgrades, and external services within P&B
- Outsourcing of maintenance functions if required
|
SYSTEMS & AUDITS | - To implement improvement project to reduce repetitive problems/breakdown or losses.
- Timely submission of Kaizen, OPL, Good to fine, suggestion on system
- Developing and sustaining Model area in respective sections
- 100% active participation in respective daily meetings and giving inputs related to bring new technology, innovation and improvements towards productivity. Conduct awareness programs down the level team
- To know about IMS and other systems requirement and documents for non-conformity in Department during internal and external audits or assessments.
- Implementation of critical spares & consumable SOP without any defilement
- Follow 7 Lead Indicators and timely closure of Workorders
|
Focus on SHE (Safety, Health & Environment) along with Sustainability initiatives | - Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
- Educating team about I know my job, I know the hazards associated with my job and I applied control measures & I escalate to my senior among manpower deployed in sections/department manpower including peer, WB & CL manpower
- Timely conducting scheduled SO round and reporting of accidents, incidents and near misses on occurrences in the area of concern in system.
- To conduct daily Tool Box, talk as schedule and before start the job any critical job along with SWP
- Active participation in safety training, safety sub committees, standard champions meeting and any safety event
- Ensure good housekeeping, limited use of power, no leakage of water, oil, air etc. and reporting concerned if any abnormalities for corrective action
- Adhering of all safety precautions on the site and off the site
- Replicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources.
|