Educational Qualification:
- B.E / B.Tech in Electrical Engineering. M.Tech Renewable Energy will be an added advantage.
- Minimum 8+ yrs of experience in Design Engineering of Renewable Projects (Solar or Wind) Working with consulting environment will have added advantage.
Key Responsibilities:
- Preparation of feasibility reports and design basis reports for RenewableProjects.
- Preparation of technical specifications preparation and equipment sizing calculations.
- Review of design analysis and detailed construction drawings Vendor document reviews, Witnessing factor acceptance tests.
- Managing the entire projects on Technical, Schedule and Cost.
- Coordinate with all project stakeholders.
Key Skills Required:
- Familiar with Over all Ground Solar PV Configurations and Floating Solar Projects. Able to choose the right configuration / technology and ratings of plant capacity and its equipment's specific to project requirements.
- Able to prepare Single line diagrams, Technical specifications, design calculations, protection schemes and drawings related to MV System and SubstationProjects.
- Familiar with physical engineering such as Equipment layouts, cable routing, Lighting, Lightning protection, and earthing layouts.
- Basic knowledge on power system analysis and reactive power compensations.
- Knowledge on International standards such as IEC, IEEE, DIN, BIS related to Electrical
equipment's and system design.
- Able to manage the Renewable Project independently in the role of Project Lead Engineer / Project Manager.
Knowledge on Floating Solar, offshore wind will have added advantage. Technical Competencies:
- Preparation of Equipment specifications.
- Preparation of performance assessment procedures.
- Review of vendor document and drawings for the Electrical Equipment's and Inverters, PV Modules, etc.
- Knowledge on GIS and AC Substation layouts including its auxiliary building arrangements.
- Knowledge of Electrical protection and control schemes.
- Perform earthing design calculations and equipment sizing calculations.
- Familiar with Electrical equipment's like Power Transformers, LV and MV cables, HV
Substation Equipment's.
- Witness Factor acceptance test and Site Testing.
- Review of O&M Manuals for the Renewable Projects.