Search by job, company or skills

Senior Engineer / Engineer - PF Mechanical (Cement Mill) | RCW

Senior Engineer / Engineer - PF Mechanical (Cement Mill) | RCW

Ultratech Cement
Fresher
Not Disclosed
Early Applicant
  • Posted 16 hours ago
  • Be among the first 10 applicants

Job Description

Job Purpose

Supervise & coordinate execution of Mechanical Maintenance activities in Cement Mill of Line No.1 for optimizing plant availability and carryout modification / improvement jobs for cost reduction & productivity improvement

Job Context & Major Challenges

Rajashree Cement is one of the single largest cement plants with an installed capacity to produce 4.2 million tons of cement /annum with captive power plant (58.2 MW) and mines, employing approximately 850 people. It manufactures a range of premium brand of cement and enjoys a reputation of giving value for money. It is one of the largest cement plant at a single location in the country. Rajashree Cement has opted for the Best World Class Technology equipment right from its inception.

The plant consists of 3 Lines, currently producing 2800, 3775 & 4800 tpd as against design of 2200, 3000 & 3500 tpd respectively.

Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)

KRA1 Accountability- Plant Availability

Supervise & coordinate all the Mechanical activities of Cement Mill of Line No.1 to maximize the plant availability to achieve continuous production as per targets * Take plant rounds /study check list daily and identify problems.

  • Scheduling of weekly major shutdowns and regular maintenance activities.
  • Supervise of maintenance activities.
  • Analyze breakdowns
  • Take corrective and preventive actions.
  • Organize manpower & material required.
  • Prepare indent & follow-up for material.
  • Coordinate for condition monitoring activities of critical equipments.
  • Coordinate with other departments for jobs.
  • Updating of daily & weekly checklist.

KRA2 Cost Control

Control cost of all the maintenance activities of Cement Mill of Line-1 as per budget in order to optimize maintenance costs.. * Prepare budget based on past data and future targets.

  • Check consumption pattern equipment-wise with respect to budget.
  • Take corrective actions.
  • Carryout Why-Why analysis.
  • Arrange manpower requirement in coordination with other section to control overtime & contractor cost.
  • Monitor the indents / inventory
  • Mechanize / improve handling system of materials.
  • Propose changes / modification for attending leakages.

KRA3 System Implementation

The system requirements of ISO, EMS, WCM systems in cement mill of Line-1 thorough the involvement of employees for improving plant working and quality standard. * Identify and improvement study and kaizen.

  • Identify & get rectified.
  • Abnormalities.
  • Spillage/leakages.
  • Unsafe conditions/practices.

5S activities.

  • Points emerged in compaigns..
  • Implementation plan for
  • Quality improvement objectives.
  • Improvement of WCM criteria score.
  • EMS targets.
  • Internal customer rating improvement.
  • Statutory compliance.
  • Improvement of OEE/MTBF/MTTR
  • Elimination of muda.
  • Does why why analysis.
  • Prepare/present weekly/monthly WCM presentation.
  • Develop one point lesson.
  • Update WCM activity board
  • Create awareness in team members.
  • Develop visual controls.

KRA4 Environment & safety: * Monitor & carryout all the activities required to maintain good house keeping and safety standards of section.

  • Identify spillage /leakage / dust emissions.
  • Study problems for corrective actions
  • Execute small modifications for improvement.
  • Organize timely checking of safety tools tackles & maintain records.
  • Educate Workmen / Contract Workmen for safe working practices.
  • Analyze accidents, near miss cases.
  • Identify potential hazards and unsafe conditions.
  • Prepare action plan and implement the same for improvement w.r.t. safety.
  • Maintain checklists of pollution control equipments
  • . Carryout audit for safety / environment.
  • Attend abnormalities identified during audits.

KRA5 Modifications/upgradation

Identify and carryout various modifications/changes required for improvement in plant working on continuous basis in the section. * Analyze breakdowns and suggestions.

  • Involve in for elimination of bottlenecks.
  • Involve in focussed improvement jobs.
  • Attend improvement meetings.

More Info

Job Type:
Industry:
Employment Type:

Key Skills

About Company