Job description
Position may include leading or executing the following assignments:
- Preparation of proposals and scope development, including conceptual designs and execution plans.
- Prepare engineering cost and Man-hour estimates and schedules.
- Develop detailed engineering drawings for EHV projects for AIS & GIS substations from 33kV to 765kV.
- Protection and control design including panel arrangements, one lines/single lines, three lines, AC schematics, DC elementaries, equipment wiring, and relay panel wiring diagrams, cable & Conduit schedules, Bill of Materials.
- Prepare calculations and reports for engineering studies (Voltage drop, AC/DC load studies & others as applicable)
- Prepare equipment specifications for procurement and/or factory acceptance testing.
- Coordinate design activities with other departments (Civil/Structural, Networks, Transmission Line & other as applicable).
- Reviewing designs and attending virtual meetings and coordinating with Clients.
- Coordinating with team members and monitoring project schedules, submitting with quality.
- Produce detailed electrical substation design packages compliant with the required client technical standards or IES/IEEE/NESC.
- Coordinate design activities with other Burns & McDonnell Global Practices and Office Locations.
- Provide guidance and mentoring to less experienced team members.
- Develop and improve processes, tools, and/or implement new technologies into the design process.
- Perform quality reviews for other engineers and designers.
- Demonstrate creativity, foresight, and judgment in anticipating and solving problems.
- Assist with the advancement and development of department tools and workflows to increase the efficiency of designs, specification development, and project execution.
- Undertake other duties and responsibilities as may be asked of this position by management.
- Participate in training/meetings to address specific organizational initiatives.
Qualifications
- Bachelor s or master s degree in electrical from an accredited institution.
- Minimum three years of experience & maximum experience of Ten years in Substation.
Skills Acquire:
- Candidate should be acquainted with NESC, IEEE standards Experience with US, Canada and UK projects is preferable.
- Membership of a relevant professional Engineering Institution (e.g., IET, CIGRE, IEC, IEEE etc.) is preferable.
- Strong knowledge of standard engineering techniques and procedures.
- Excellent written and verbal communication skills.
- Ability to work methodically and analytically in a quantitative problem-solving environment and demonstrated critical thinking skills.
- Proficient in standard engineering techniques and procedures.
- Strong computer skills (e.g., Microsoft Office Suite)
- Strong diligence, facilitation, team building, collaboration, organization, and problem-solving skills.
- Basics of Substation automation system based on IEC61850.
- Considered- knowledge of Relay Testing and Control / Protection scheme testing.
- Considered- AutoCAD electrical & Substation 3D Design suits.