- Posted 4 hours ago
- Be among the first 10 applicants
Job Description
PIPING SUPERINTENDENT
Summary Of Position
To achieve the piping discipline's targets for schedule, quality, safety, and cost, and under the overall project plan and the Piping Manager's direction, organize crews through the full cycle of fabrication, erection, testing, reinstatement, and handover, with direct responsibility for crew productivity and first time fit-up pass rate.
Duties And Responsibility
Be familiar with relevant pipeline construction specifications and independently prepare technical documents such as construction plans and Inspection and Test Plans (ITP). Based on project characteristics and Client requirements, prepare construction disclosure records and organize detailed briefings with the crews. Organize technical staff to review drawings, identify design issues, and submit them for design verification; organize secondary design and establish discipline databases (material library, weld library, support library, spool library, etc.). Plan the site layout, including temporary facilities, office areas, construction power panels, prefabrication yards, storage areas, and zones for finished products, semi-finished products, and raw materials. Organize piping prefabrication and control quality of length calculation, lay-out, cutting, visual inspection, and other processes. Organize daily output statistics and labor-efficiency analysis, and identify issues affecting productivity (material shortage, employee skills, design issues, incentive feasibility); post daily output on wall boards and support the Construction Manager with cost analysis ledgers. Organize the registration and management of design changes, and promptly obtain sign-offs for additional quantities arising from changes. Record facts affecting efficiency and progress during construction, retain evidence by photos, records, or e-mails, and support claims documentation during execution. Understand the importance of spool release, and organize and track all in-process NDT and heat treatment (RT, UT, PT, MT, FT, PAUT, PMI, HT, PWHT); erection progress depends on spool coating progress, which in turn depends on weld acceptance rate and NDT turnaround. Organize spool erection: prepare the erection plan according to structural steel and equipment release conditions, and quantify actual and impacted quantities as input to weekly and monthly plans. Organize field execution in close cooperation with crews; understand the capacity and daily reporting status of each crew and position for the coming three weeks and resolve problems promptly; for positions failing to report for two consecutive days or with persistently low efficiency, analyze causes and take measures to eliminate idle and waiting time. Focus on erection completeness (supports installed simultaneously, valve and instrument delivery, verification of un-installed valve lengths against isometrics), and resolve factors preventing line closure (material issues, un-prefabricated spools, spools not released for coating due to unfinished RT); minimize repeated mobilization to the same drawing or location and frequent tool moves, which cause substantial productivity loss in later project stages. Divide test packages per Line List and P&IDs, prepare test plans and equipment (blinds, buffer tanks, air compressors, water tanks, pressure gauges, torque wrenches, etc.), arrange temporary water supply networks, and set up testing, flushing, and reinstatement teams with detailed briefings for every work step. Organize preparation and completion of test packages, PCA cleaning, field pressure testing, and flushing, advancing steadily per plan to meet the Client's schedule requirements. Organize reinstatement, including punch-B closure, valve testing and coating, torque tightening, box-up, touch-up, stress-free alignment at equipment nozzles, instrument re-installation, and system nitrogen / dry-air protection. Support pre-commissioning, manage MC/CC and work-done punch items, and ensure system commissioning is safe and reliable with no hidden defects. Support the Client in test runs and start-up escort, striving for first-time start-up success. Organize preparation, compilation, and handover of as-built documentation; support the materials department with write-offs and the commercial department with project close-out.
Qualifications
Essential Requirement
Familiar with ASME B31.3 and Client standards (SABIC SAES-SATIP / ARAMCO systems); able to independently prepare construction plans, ITPs, and test plans; able to organize prefabrication and erection of large process units. None mandatory; welding- or NDT-related certificates preferred. Working experience in petrochemical projects in Saudi Arabia preferred.
Education Requirements
Diploma or Bachelor's Degree in Mechanical Engineering is preferred. ITI / Technical qualification in Mechanical or Piping may also be considered with substantial relevant experience. Candidates must have a strong technical understanding of piping construction and installation. Piping, mechanical, process equipment, or related engineering disciplines.
Physiological Requirements
Aged 30-45 (relaxable for highly experienced candidates). Strong and energetic. Normal vision. In good health with no infectious diseases that prohibit overseas assignment.
Language Requirements
Proficient in English listening, speaking, reading, and writing; able to communicate directly with Client engineers. The ability to speak basic Arabic is preferred.
Required Experience
Minimum 5 years of experience as a Piping Supervisor in oil & gas, petrochemical, refinery, or industrial construction projects. GCC experience is mandatory. Saudi Aramco, SABIC, SATORP, SADARA, Ma'aden, or another major petrochemical project experience is highly preferred. Document Required
Updated CV, Educational and technical qualification certificates, Experience certificates from previous employers, Details of previous GCC projects and client approvals, Current and expected salary details.
More Info
Key Skills
About Company
ASMACS
