Search by job, company or skills

PF TPP (Electrical Shift Oprn)

Fresher
Early Applicant
  • Posted a day ago
  • Be among the first 10 applicants

Job Description

Job Description

Key Result Area 1: Plant Maintenance & Reliability

Objective: Ensure reliable operation and maintenance of TPP, DG Sets, and associated electrical systems to supply uninterrupted power to the Cement Plant.

Supporting Actions:

  • Monitor and supervise all major electrical equipment of TPP, including CHP, Boiler, Turbine, WTP, DG Sets, Alternators, Switchgear, Motors, and Auxiliary Systems.
  • Carry out condition monitoring activities and maintain records in SAP.
  • Monitor electrical parameters of TPP Units #1 & #2 and record observations in logbooks.
  • Prepare daily power generation, power distribution, and auxiliary consumption reports.
  • Coordinate with Mechanical, Instrumentation, and Electrical maintenance teams for preventive and breakdown maintenance.
  • Ensure safe isolation (LOTO) and shutdown procedures during maintenance activities.
  • Attend and rectify electrical breakdowns during shift operations.
  • Support annual shutdown maintenance activities of all TPP electrical equipment.
  • Monitor and control electrical auxiliary power consumption.
  • Coordinate with Cement Plant operations for load management and load shedding requirements.
  • Coordinate with Solar Power Plant (5 MW) and Desalination Plant for optimum power utilization and load balancing.
  • Manage blackout situations, synchronization of TPP Units, DG synchronization, and black-start DG operations.
  • Execute approved electrical projects and modifications as per timelines.
  • Ensure availability and procurement of electrical maintenance materials and spares.
  • Complete statutory compliance activities related to electrical systems as per schedule.
  • Adopt WCM practices to achieve defect-free, pollution-free, and safe operations.
  • Identify, generate, and implement improvement opportunities in electrical systems.

Key Result Area 2: Cost Control & Resource Optimization

Objective: Operate and maintain the plant in a cost-effective manner to minimize power generation costs.

Supporting Actions:

  • Optimize plant operation to improve equipment efficiency and reduce auxiliary power consumption.
  • Effectively schedule maintenance activities to minimize downtime and manpower costs.
  • Ensure optimum utilization of manpower and resources during shifts.
  • Rearrange shift duties and deploy resources efficiently during absenteeism.
  • Control maintenance costs through proper planning and material management.
  • Monitor and recommend measures to reduce electrical energy losses.

Key Result Area 3: Operational Excellence

Objective: Coordinate maintenance and operational activities for smooth, safe, and trouble-free plant operation.

Supporting Actions:

  • Coordinate closely with TPP Operations for stable and efficient plant operation.
  • Operate electrical switchboards and power distribution systems during emergencies.
  • Coordinate with Mechanical, Instrumentation, and Operations teams for effective problem-solving.
  • Ensure optimum loading and load sharing among TG, DG, Solar Plant, and Cement Plant.
  • Support operational continuity through timely response to electrical abnormalities.
  • Monitor critical equipment and identify potential operational risks.
  • Ensure plant availability, reliability, and uninterrupted power supply.
  • Achieve Zero Fatality and Zero Lost Time Injury (LTI) related to Electrical & Instrumentation activities.

Key Result Area 4: Safety, Health, Environment (SHE) & Sustainability

Objective: Ensure compliance with all safety, health, environmental, and sustainability standards.

Supporting Actions:

  • Ensure 100% compliance with all applicable safety standards, procedures, and statutory requirements.
  • Conduct regular Safety Observation (SO) rounds and report accidents, incidents, and near misses.
  • Conduct Toolbox Talks and reinforce Safe Work Practices (SWP) before commencement of critical jobs.
  • Promote awareness of workplace hazards and necessary control measures among employees and contractors.
  • Participate actively in safety training programs, safety committees, and safety campaigns.
  • Ensure compliance with LOTO and electrical safety procedures.
  • Maintain good housekeeping and identify unsafe conditions for immediate corrective action.
  • Monitor and prevent wastage of power, water, oil, and compressed air.
  • Encourage and implement environmental conservation and sustainability initiatives.
  • Drive awareness on responsible utilization of natural resources among team members.

Key Result Area 5: Systems Management & Continuous Improvement

Objective: Ensure effective implementation of IMS, WCM, quality systems, and continuous improvement initiatives.

Supporting Actions:

  • Ensure compliance with IMS, ISO, EMS, and other management system requirements.
  • Implement improvement projects to reduce repetitive breakdowns, losses, and process inefficiencies.
  • Submit Kaizens, OPLs, Good-to-Fine observations, and improvement suggestions regularly.
  • Develop and sustain model areas within the electrical section.
  • Participate actively in KFA, GRT, and review meetings.
  • Identify and recommend new technologies, innovations, and productivity improvement initiatives.
  • Conduct awareness programs for team members on systems and quality requirements.
  • Ensure closure of audit observations and non-conformities arising from internal and external audits.
  • Implement SOPs related to critical spares and consumables management.
  • Identify leakage points, unsafe conditions, and environmental issues and ensure timely rectification.
  • Monitor emissions and ensure compliance with environmental norms.
  • Support continuous improvement efforts aimed at enhancing plant reliability, productivity, quality, and safety.

Reporting Relationships

  • Designation: PF - TPP (Electrical Shift Operations)
  • Department: Thermal Power Plant (Electrical)
  • Function: Electrical Maintenance & Operations
  • Reporting To: SH/Section Head - TPP Electrical

Key Performance Indicators (KPIs)

  • Power Plant Availability (%)
  • Breakdown Hours
  • Auxiliary Power Consumption (%)
  • Electrical Equipment Reliability
  • Compliance Closure (%)
  • Safety Observations & Compliance
  • Zero LTI / Zero Fatality
  • Kaizen & Improvement Implementation
  • Audit Compliance Score
  • Power Generation & Distribution Effectiveness

More Info

About Company

Job ID: 151859649

Similar Jobs

India

Skills:

load management SAPEmsImsLoad sheddingIsoPower DistributionWCM practicesCondition MonitoringStatutory compliancePower GenerationElectrical Systems

Beware of Scammers

We don’t charge money for job offers