Job Description
Key Result Areas
Supporting Actions
Aviablity of Engineering Drawing
Development of drawings for layouts, Capex proposals, equipment drawings, and machinery parts to meet the requirement of plant for smooth execution of projects. Feasibility and detail engineering checking and inspection of drawing spares modified in the existing system
To Conduct site survey in co-ordination with concern plant Personal to collect relevant data from site.
To prepare required modification or as built drawing for further development work
Cooperate and communicate effectively with contractor s manager and other project participants to provide assistance and technical support.
Assistance in Detail engineering,
Cost Control and Co-ordination with internal and external customers
Timly allotment of recourse as per priroty and monitoring of Logbooks. Timly BOQ calculation for timly raising of PR. Maintain all drawings records sectionwise for easy retrival time.
Proper cordination and allotment of hydra,crane and trailer to other department for maximum utilization of Resource.
Preparing the Progress of all Capex Project drawing status.
Timely prepare the manpower Supply PR and follow-up for making PO by purchase Dept, to avoid the difficulty in crane Operation. Approval of Drawings. Clarification of Drawings. Final Checking of dimensions to suit our requirements.
To assist erection activity at site clarification.To avoid rework & digitization of drawing
Optimize use of steel and avoid wastage by using identified surplus items.
SHE (Safety, Health & Environment) along with Sustainability initiatives
Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
Educating team about I know my job, I know the hazards associated with my job and I applied control measures & I escalate to my senior among manpower deployed in sections/department manpower including peer, WB & CL manpower
Timely conducting scheduled SO round and reporting of accidents, incidents and near misses on occurrences in the area of concern in system.
To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWP
Active participation in safety training, safety sub committees, standard champions meeting and any safety event
Ensure good housekeeping, limited use of power, no leakage of water, oil, air etc and reporting concerned if any abnormalities for corrective action
Adhering of all safety precautions on the site and off the site
Replicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources.
System Management
(Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards)
To implement improvement project to reduce repetitive problems/breakdown or losses.
Timely submission of Kaizen, OPL, Good to fine, suggestion on system
Developing and sustaining Model area in respective sections
100% active participation in respective KFA & GRT meetings and giving inputs related to bring new technology, innovation and improvements towards productivity. Conduct awareness programmes down the level team
To know about IMS and other systems requirement and documents for Non-Conformity in section during internal and external audits or assessments.
Implementation of critical spares & consumable SOP without any defilement
Identify & arrange rectification of leakage points/unsafe points along with monitor & take corrective action for emission levels.