
Search by job, company or skills
Job Purpose
To support the Section Head - Mechanical in planning, organizing, and coordinating mechanical field operations and maintenance of the Packing Plant systems, including packers, roto packers, spout assemblies, aeration systems, bag filters, bag applicators, palletizers (if applicable), truck/wagon loading machines, conveyors, elevators, air slides, compressors, and all associated auxiliaries.
The role involves implementing and monitoring preventive, predictive, and conditionbased maintenance practices-such as vibration analysis, thermography, lubrication management, and visual inspections-to enhance equipment reliability, improve MTBF, and ensure consistent packing and dispatch operations.
The position holder is responsible for planning and executing planned shutdowns, packer overhauls, major maintenance activities, and breakdown interventions to minimize downtime, avoid packing losses, and ensure maximum plant and dispatch availability.
Further, the role focuses on optimization of maintenance costs through effective spare parts planning, structured job execution, inventory management, and RCFAbased corrective and preventive actions for repetitive failures.
Strict adherence to UltraTech Cement safety standards, statutory requirements, and maintenance SOPs is mandatory, along with close coordination with operations, electrical & automation teams, dispatch, OEMs, and contractors to achieve packing and despatch targets, product integrity, and Zero Harm objectives as per PF and WCM guidelines.
Job Context & Major Challenges
Job Context:- Aligarh Cement Harduaganj (A unit of UltraTech Cement Limited) is located at Village Kasimpur , Tehsil koil Dt. Aligarh (U. P.). It is a grinding & packing unit with an installed capacity of 4.5 MTPA. This unit was commissioned in May -09 consisting of Close Circuit Ball Mill with High Efficiency Separator, 2X12 spout Packer Machine. It manufactures Ultratech Cement in various Blends. This unit is one of our most modern establishments of UltraTech cement Limited. The basic raw material i.e. clinker received from Vikram Cement, Khor (M.P.) and Aditya Cement, Shambhupura (Rajasthan).
The main product is flyash based, which is being sourced from Thermal power station Aligarh and cement is supplied to mainly in Eastern UP .. The plant has a state of the art technology featuring Expert System of DCS with fully equipped modern laboratory to ensure optimum production and consistent quality product, these are the latest equipment in cement grinding process. 1. To reduce the power consumption. 2. To increase the flyash TPH to design capacity
Major Challenges -
1.Less availability of equipment's for maintenance due to continuous plant operations and high despatches.
2.To ensure optimum availability of Cement mill throughout the year and systematic implementation of maintenance schedule to achieve production targets.
3.To optimise operations to achieve better business results in power consumption, fuel consumption and fly ash consumptions.
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters) | Supporting Actions (Max 1325 Characters) | |
KRA1 | Plant Availability: | - Execution of preventive & corrective maintenance activities. |
KRA2 | Cost control: | . Reduction in section cost by reducing breakdowns. |
KRA3 | Management Information System | 1.Ensuring timely submission of monthly MIS / Presentations and Reports |
KRA4 | Focus on SHE (Safety, Health & Environment) along with Sustainability initiatives | Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area. |
KRA5 | System Management | -To implement improvement project to reduce repetitive problems/breakdown or losses. |
Job ID: 148306881
We don’t charge any money for job offers