Mechanical BOP System & Detailing Engineering
Mechanical BOP System & Detailing Engineering
Quest GlobalEarly Applicant
- Posted a month ago
- Be among the first 10 applicants
Job Description
Job Requirements
Mechanical BOP System & Detailing Engineering:
Work Experience
Mechanical BOP System & Detailing Engineering:
Mechanical BOP System & Detailing Engineering:
- Should have 5 to 8 years of hands-on experience in both System Engineering and Bought-Out Engineering and Detail Engineering experience from Balance of Plant (BOP) systems Projects of Thermal Power Plant, Combined Cycle and Supercritical Power plants.
- Should Have experience in understanding of each BOP systems and also hands on experience in these deliverables Piping & Instrumentation Diagram (P&ID), System Design Documents – Sizing Calculation, Technical/Order Specifications (Level 1 & Level 2), Technical Tender Analysis (TTA) including Order request for Procurement.
- Should Have experience in following BOP Systems design and its associated equipment packages and Sub-Contract packages.
- Plant Water Systems - Raw Water, DM Water, Main Cooling Water, Closed Cooling Water and water treatment
- Compressed air System
- Fuel gas system
- Equipment Post order drawings / documents Review & Approvals and Transmitting to Client
- Site Coordination.
- Should have experience in Plant layout drawings reviews such as General Arrangement Drawing, Technical Specification, Data Sheet & Technical Bid Evaluation, Creating Bill of Material (BOM) for new Arrangement drawings, Commissioning spare parts list
- Interface details with other Disciplines [Civil, Electrical &Instrumentation]
- Should have experience in preparation of Ordering Specification/Modification Kit/Field Modification Instruction manual - FMI.
- Should have demonstrated ownership & decision-making of the design, considering cost, feasibility in manufacturing and fabrication.
- Should have served as primary interface with customers and have demonstrated the implementation of design requirements, design changes, analysis, and verification of each task.
- Should have excellent Coordination skills with all Cross-Functional Teams such as Vendor Management & Procurement Support, Process Team, Electrical Team etc.
- Engineer should have confidence with autonomy to deliver as work package is critical
- PTS (Project Tool Suits), PPDM, Citrix Tool for L1/L2 Documents Release.
Work Experience
Mechanical BOP System & Detailing Engineering:
- Should have 5 to 8 years of hands-on experience in both System Engineering and Bought-Out Engineering and Detail Engineering experience from Balance of Plant (BOP) systems Projects of Thermal Power Plant, Combined Cycle and Supercritical Power plants.
- Should Have experience in understanding of each BOP systems and also hands on experience in these deliverables Piping & Instrumentation Diagram (P&ID), System Design Documents – Sizing Calculation, Technical/Order Specifications (Level 1 & Level 2), Technical Tender Analysis (TTA) including Order request for Procurement.
- Should Have experience in following BOP Systems design and its associated equipment packages and Sub-Contract packages.
- Plant Water Systems - Raw Water, DM Water, Main Cooling Water, Closed Cooling Water and water treatment
- Compressed air System
- Fuel gas system
- Equipment Post order drawings / documents Review & Approvals and Transmitting to Client
- Site Coordination.
- Should have experience in Plant layout drawings reviews such as General Arrangement Drawing, Technical Specification, Data Sheet & Technical Bid Evaluation, Creating Bill of Material (BOM) for new Arrangement drawings, Commissioning spare parts list
- Interface details with other Disciplines [Civil, Electrical &Instrumentation]
- Should have experience in preparation of Ordering Specification/Modification Kit/Field Modification Instruction manual - FMI.
- Should have demonstrated ownership & decision-making of the design, considering cost, feasibility in manufacturing and fabrication.
- Should have served as primary interface with customers and have demonstrated the implementation of design requirements, design changes, analysis, and verification of each task.
- Should have excellent Coordination skills with all Cross-Functional Teams such as Vendor Management & Procurement Support, Process Team, Electrical Team etc.
- Engineer should have confidence with autonomy to deliver as work package is critical
- PTS (Project Tool Suits), PPDM, Citrix Tool for L1/L2 Documents Release.
More Info
Key Skills
Equipment Post Order Drawings
Citrix Tool
Plant Layout Drawings
Technical Order Specifications
Compressed Air System
PPDM
Sizing Calculation
Plant Water Systems
Fuel Gas System
Ordering Specification
Technical Specification Data Sheet
Modification Kit
System Design Documents
General Arrangement Drawing
Bought-Out Engineering
Technical Bid Evaluation
