Manager : Control & Instrumentation
Manager : Control & Instrumentation
Larsen & ToubroThis job is no longer accepting applications
Job Description
Areas Of Exposure/ Work Background
Primary
JOB DUTIES/RESPONSIBILITIES
- Experience of working in FEED, Proposal Engineering, Detailed Engineering, Knowledge on application of Field Instruments, Gas Analyzers, F&G System, FDAS, Valve Sizing, DCS/ PLC Control System, ESD System, Level Setting Diagram, Cause & effect diagram, Control Narratives, CCTV System, Instrument Hook Up Drawings, BOQ Estimation of I&C commodity like Filed Instruments, I&C Cable, I&C Installation Hardware, I/O Count Estimation etc. Specification Preparation, Bid Evaluation, Vendor Drawing review of I&C / Mechanical Packages
- Factory Acceptance Test of I&C System DCS/ PLC etc.
- Knowledge & understanding of I&C Codes & Standards (Flow instrument sizing, Control Valve Sizing, Hazardous area, NFPA, etc)
Primary
JOB DUTIES/RESPONSIBILITIES
- Specification preparation, Bid evaluation & vendor drawing review - Control System (PLC/ DCS/ ESD), Field Instruments, Gas Analyzers, F&G System, FDAS, Control Valve/ On Off Valves, I&C Cables etc.,
- Sizing calculation of Control Valve, Flow Element, Instrument Selection as per Hazardous Area classification, I&C cable Sizing etc.
- Preparation/ Review of Control System Configuration Drawing, Instrument Index, I/O List, JB Schedule, I&C Cable Interconnection Drawings, UPS load List, Data Sheets of Instruments, valves, Control System (PLC/ DCS), Control Loop/ Logics, Control Valves/ on/ Off Valves, etc.
- Preparation & Review of Instrument Hook Up Drawings, Instrument Location Layout
- BoQ Estimation of Field Instruments, Analyzers, F&G System, FDAS, Valves, I&C cable, Erection Hardware, JB, Instrument Racks
- Vendor Coordination,
- FAT of Control System
More Info
Key Skills
Factory Acceptance Test
ESD System
Level Setting Diagram
Flow instrument sizing
Instrument Hook Up Drawings
FDAS
Valve Sizing
Cause effect diagram
PLC Control System
Control Valve Sizing
Control Narratives
CCTV System
Gas Analyzers
Hazardous area NFPA
Vendor Drawing review
Specification Preparation
BOQ Estimation
