Search by job, company or skills

GES D&R - Exterior Trims Requirement- ZR_1913_JOB (Position Closed)

GES D&R - Exterior Trims Requirement- ZR_1913_JOB (Position Closed)

satyam venture
Fresher
Not Disclosed
  • Posted 16 hours ago
  • Be among the first 10 applicants

Job Description

Job Title:

    GES D&R - Exterior Trims Requirement

    • 7 - 12 Years
      • Job Location:

        • Chennai

        Job Description:

        • Provide specialist engineering services for UP/UN Body Functional Trims and Heat Shields -covering design, development, supplier industrialization, validation, PPAP, and launch support through MP-2 and J1+90.

        Core Responsibilities:

        • Milestone and Governance
        • Own FEDE deliverables, gateway readiness, and timing adherence maintain full DVP traceability and status.
        • Align DVPs with Core Technical Specialists keep FEDE up to date with proof of completion.
        • Supplier and Change Management
        • Partner with suppliers to forecast milestones, confirm part supportability, and track tool readiness.
        • Lead Concern Release: author changes with detailed scope, timing, and cost drive approvals and disciplined implementation.
        • Coordinate with interfacing D&R owners to manage impacts and maintain package/attribute integrity.
        • Engineering and Validation Execution
        • Define and execute DV (CAE and physical) and PV plans commission proto builds/tests when indicated by CAE.
        • Close DV/PV issues with appropriate design/process fixes verify via re-test/correlation as needed.
        • Maintain and update DFMEA, P-Diagram, and SCCAF based on latest learnings.
        • Industrialization, PPAP, and Launch
        • Lead PPAP through PSW plan and execute line trials and build events with plants.
        • Resolve design, supplier quality, and manufacturing issues during change implementation up to J1+90.
        • Ensure Launch builds adhere to Global LQOS standards and roles & responsibilities.
        • Reporting and Ways of Working
        • Produce rigorous validation and issue investigation reports (including 8D) to IMG PD standards with complete backup data.
        • Maintain a collaborative, hands-on presence with daily engagement across CFTs, suppliers, and plants.
        • Success Measures (KPIs)
        • Robust, risk-managed program plan lessons learned applied from prior launches.
        • On-time FEDE/gateway deliverables zero meeting delays timely signoffs.
        • CAD proposals delivered to meet design-phase milestones.
        • Zero in-plant defects that should have been caught at supplier signoff.
        • Pre-production build issues: root cause and ICA within 24 hours.
        • Clean launch and field performance with proactive risk mitigation.

        Skill set:

        • CAD/PLM: 3DX/CATIA V6/V5 Teamcenter, Vis Mockup, DMU. Program control: GPDS FEDE milestones DVP Concern Release 50:50 D&R/CAD. Validation: DV/PV plans CAE-to-proto rapid 8D RCA ICA/PCA closure. Manufacturing/launch: DFM/tooling PPAP/PSW line trials plant support to J1+90. Suppliers/CFTs: Drive suppliers align D&R/CAE/STA/VOME/Attributes LQOS DFMEA, P‑Diagram, SCCAF proactive risk/Plan‑B.

        Domain Knowledge:

        • Systems and Components
        • UP/UN Body Functional Trims and Heat Shields: package constraints, interfaces, mounting strategies, durability, NVH, and thermal protection near exhaust/powertrain and underbody zones.
        • Materials and construction methods for heat shields (aluminized steel, stainless, multi-layer insulation, embossed/beaded forms) and functional trims (stamped metal, molded plastics, clips/fasteners, adhesives/tapes).
        • Manufacturing and Tooling
        • Stamping/forming/embossing, piercing, clinching/riveting, spot welding, adhesive bonding, and tape applications design for assembly and service access.
        • Tooling feasibility, draw/bead strategies, flange and hole pattern optimization, tolerance stack-ups, and GD&T appropriate for body-in-white and underbody environments.
        • Validation Methods
        • CAE: thermal mapping, conduction/convection/radiation assessments, modal/vibration for rattle robustness, durability.
        • Physical testing: thermal soak, hot-spot verification, rattle/buzz, corrosion/stone-chipping exposure, vibration/durability, fit-and-finish checks.
        • DVP&R planning, correlation strategies, acceptance criteria, and re-test closure protocols.
        • Quality, Launch, and Compliance
        • APQP/PPAP/PSW, control plans, process capability considerations, and run-at-rate expectations.
        • Ford processes and standards: GPDS, FEDE, LQOS, DFMEA, P-Diagram, SCCAF, Concern Release, and AIMS.
        • Build phases and events: DCV builds, pre-production/line trials, MP-2, and support through J1+90.
        • Attribute alignment: thermal, NVH, durability, corrosion, and serviceability requirements at vehicle level.
        • Cross-Functional Ecosystem
        • Collaboration with D&R, CAE, STA, VOME, Attribute Teams, and Global/Regional engineering effective supplier development and escalation paths for timing, quality, and cost Purpose.

    More Info

    Job Type:
    Function:
    Employment Type:

    Key Skills

    line trials

    8D RCA

    DVP Concern Release

    3DX

    Manufacturing launch

    CAE-to-proto rapid

    plant support

    proactive risk

    GPDS

    ICA PCA closure

    P-Diagram

    SCCAF

    DFM tooling

    FEDE milestones

    PSW

    DV PV plans

    Vis Mockup

    About Company