Electrical Engineer
- Posted a month ago
- Be among the first 10 applicants
Job Description
Job Description
- Review all construction site design architectural drawings and co-ordination with designing team for proper smooth operation at site.
- Oversee solar structure erection, inverter control room (ICR), and main control room (MCR) civil foundation works.
- Manage module mounting structure (mms) erection and co-ordinate DC/AC cable trench marking, excavation, DC/AC cables laying, and cables termination works.
- As per norms following standard operating procedures (sop) for construction activities at site.
- Conduct surveillance and reviews of the quality systems.
- Monitor closeout corrective actions.
- Proactive approach to improve quality of work at site.
- Minimize rework and demonstrate continuous improvement.
- Ensure that vendors are in compliance with quality systems.
- Carry out phased inspections as specified.
- Check the works in the areas of responsibility for compliance with the specifications.
- Monitoring of String combiner box/string monitoring box (SCB), marking, erection, cables termination works. As well as Supervising of SCB grouping process.
- Monitoring of central inverters/String inverters, inspection, un-loading, installation, cables termination process.
- Monitor unloading, erection, and pre-commissioning testing of electrical
- equipment, including inverter duty transformers, IDT capacity.
- Oversee Distribution transformer, 50KVA, physical inspection, erection, cables termination works at MCR end.
- Oversee un-interrupted power supply (UPS), power pack, installation works at site.
- Oversee DC distribution boards (DCDB), AC distribution boards (ACDB), physical inspection, erection, testing, pre-commissioning activities at site.
- LT/HT panels, physical checking, un-loading, erection, cables termination works, and Pre-Commissioning, testing, witnessing activities.
- Monitoring of vacuum circuit breakers, and SF6 circuit breakers, Lightening arrestors, isolators physical inspection, unloading, erection, Pre-Commissioning testing, witnessing activities.
- Ensure compliance with Indian Standards (IS) codes and Standard Operating Procedures (SOPs) for construction activities.
- Supervising of array grid earthing, DC/AC cable healthiness checking (insulation resistance, Hi-Pot testing), and earth pit installations.
- Manage pooling substation (PSS) civil and electrical works, including power transformer, physical inspection, erection and testing, witnessing activities.
- Erection of AC/DC panels in control room in pooling substation.
- Oversee Power cables, DC cables and control cables laying and termination works.
- Control and Relay panel physical checking, unloading, erection, Pre-Commissioning, testing, witnessing activities.
- Coordinate with contractors, subcontractors, and project managers to ensure smooth operations.
- Prepare non-conformance reports (NCRs), and follow up for close out, find out root cause analysis.
- Raise punch points before Pre-Commissioning time and follow up for proper close out.
- Updating daily labor reports, and daily progressive reports to management
- ensuring inward material, compliance via checklists and Material Dispatch Clearance Certificates (MDCC).
- Monitoring of Power Transmission lines, Preliminary survey, check survey, final survey routes, involving tower pit marking, tower pit excavation, tower foundations work as well as power lines stringing works.
- Solar power plant readiness checking such as DC/AC works completion status before Pre-Commissioning.
- Allocation of daily works to contractors, supervisors, obtaining daily work progress.
- All the machinery at site required documents checking, maintaining at site.
Attending the OEM factories for materials inspection as required.
Qualifications
- Diploma in Electrical / bachelor's degree in electrical engineering
- 4-10 Yrs Experience in Solar Renewable Energy as Block DC/ AC Electrical Engineer
- Strong written and verbal communication
More Info
Key Skills
Solar Structure Erection
Healthiness Checking
Pre-Commissioning Testing
Compliance with Indian Standards
