1. Build Complete Production and Disaster Recovery (DR) Site PIM Instance and DR for Client PIM Instance:
- Design PIM Environment:Design the PIM environment to support the Telco setup.
- Prepare High-Level Diagram (HLD) and Low-Level Diagram (LLD) for PIM.
- Support all design modifications required to run business from the CyberArk PIM solution during operations.
- Integration Design & Documentation:Create complete integration design documents.
- Handover documents to PwC Project Manager for review with complete details.
2. Migrate Existing Integrations from Current PIM Setup to New PIM Setup:
- Migration Strategy & Execution:Prepare migration strategy along with relevant PIM team members.
- Run migration activities with minimal business disturbance.
- Prepare the ecosystem for on-boarding/migrating systems and users from the existing environment.
- Project Planning & Operations:Prepare and execute a complete project plan within the stipulated timeframe.
- Prepare complete Standard Operating Procedures (SOPs) for operations.